Estero Report
20
Total Documents
Jan 2021 — May 2026
Date Range
Recent Documents
2020 2021 Water Monitoring Report
This report tracked water levels, flow, and quality in Estero from August 2020 to September 2021. Johnson Engineering set up monitoring stations along Estero River and Halfway Creek...
View original →2021 2022 Water Monitoring Report
The Village of Estero hired engineers to track water in Estero River and Halfway Creek. They measured water height, how fast water moved, and water cleanliness from October 2021 through September 2022...
View original →2022 2023 Water Monitoring Report
The Village of Estero monitored water for one year across Estero River and Halfway Creek. Seven permanent sensors recorded water levels continuously while staff collected water samples monthly...
View original →2023 2024 Water Monitoring Report
The Village of Estero monitored water in Estero River and Halfway Creek from October 2023 through September 2024. The program tracked water levels, flow rates, and water quality at multiple monitoring locations...
View original →2024 2025 Water Monitoring Report
Estero's water quality report covers October 2024 through September 2025. The town monitors rivers and streams to track pollution and bacteria...
View original →2021 Traffic Counts Report
The Village of Estero hired an engineering firm to count traffic. Traffic counts happened at ten road locations from February to March 2021...
View original →2022 Traffic Counts Report
The Village of Estero collected traffic data from seventeen roads. Engineers recorded vehicle counts over seven days in early 2022...
View original →2023 Traffic Counts Report
Estero hired Johnson Engineering to study traffic at 15 roadway locations. The study collected traffic data over seven days in February and March 2023...
View original →2024 Traffic Counts Report
The Village of Estero hired Johnson Engineering to study traffic. Engineers counted cars at 15 locations in 2024...
View original →2025 Traffic Counts Report
Johnson Engineering prepared a traffic study for the Village of Estero. The study counted vehicles on 15 roads over seven-day periods...
View original →Village Wide Traffic Study Update
The Village of Estero studied traffic on its roads and intersections. Traffic counts from 2024 show that two major roads already exceed safe capacity...
View original →The Village Of Estero Area Wide Traffic Study
The Village of Estero commissioned a study of traffic on major roads. Researchers counted vehicles at intersections in February 2017...
View original →Estero Stormwater Master Plan
The Village of Estero made a plan to handle rainwater and prevent flooding. The plan studies local rivers and creeks to understand water flow...
View original →2025 Annual Building Report
2024 Annual Report
Estero Comprehensive Plan
Village Council Rules Of Procedure Through 2023 With Council Revisions Clean
Ord No. 2025 05 Cip Business Impact Statement
Mar 10, 2026 Estero Study Engagement Session 2 Boards
The Village of Estero held an Open House to present the Estero Eco-Historic Planning Study, a comprehensive framework for sustainable and resilient growth in Old Estero. The study, funded by the Lee County Recovery and Resiliency Planning Program, focuses on balancing development, open space, and conservation across a 1,000-acre study area that includes the Estero River, US-41 corridor, and the planned Bonita-Estero Rail Trail...
View original →Eco Historic Study March 2026 Presentation
The Town of Estero is conducting the Eco-Historic Planning Study to create a framework for sustainable and resilient growth in the "Old Estero" area covering over 1,000 acres, including the Estero River, the US-41 corridor, and the planned Bonita-Estero Rail Trail. This planning report summarizes findings from Phase 1 community engagement (data collection, interviews with 7-60 Village Council members, and an open house in June 2025 that drew approximately 760 attendees) and presents a draft vision and strategy framework...
View original →Sign up free to browse all 20 report
Create Free AccountGet notified when new report are filed in Estero
Instant alerts starting at $4.99/mo