Search Florida filings
Every active municipality, every public filing type — meetings, permits, ordinances, hearings.
25 results for “tabled”
- Agenda
2025-11-11 Final Agenda Package Cedar Hammock
Jul 1, 2026Cedar Hammock CDD, Collier County
The District adopted stormwater management rules after a public hearing. The Board approved bridge repairs and erosion control projects. Capital spending includes bridge work, lake management, and drainage improvements.
- Agenda
FLD2026-01003: Flexible Development approval for light assembly and retail sales and services as a Comprehensive Infill Redevelopment Project in the Commercial (C) District for the properties located at 1425, 1429, 1433 and 1477 S. Ft. Harrison Avenue and the conversion to non-residential off-street parking in the Medium Density Residential (MDR) District for the properties located at 514 Belleview Boulevard. The existing buildings do not exceed 25 feet in height and include 43 off-street parking spaces. Requested is flexibility from front setback requirements, the use, and reduced interior landscaping and landscape buffers along the property lines through a Comprehensive Landscape Program. (Community Development Code Section 2-304.D, 2-704.F, and Sections 3-1202.D., E. and G.) (Level Two Application) — FLD2026-01003: CDB PUBLIC MEETING PRINT SET - PLANS — Community Development Board (2026-06-16)
Jun 16, 2026City of Clearwater, Pinellas County
This document is architectural plans for renovations to multiple commercial buildings on Fort Harrison and Belleview Boulevard. The plans show roof replacements, interior remodels, window replacements, and exterior wall updates. This is construction documentation, not a government meeting agenda.
- Agenda
FLD2008-05013A: Flexible Development approval for an outdoor amenity area, accessory to existing 450 overnight accommodation units in the Tourist (T) District and the Open Space/ Recreation (OSR) District as a Comprehensive Infill Redevelopment Project and the Beach Walk District of Beach by Design for the property located at 100 Coronado Drive. The existing building is 150 feet in height and includes 543 off-street parking spaces. Requested is flexibility for the use and reduced landscaping along the west property line through a Comprehensive Landscape Program. (Community Development Code Section 2-803.D, Section 2-1404.A., Section 3-1202, Article 4, Division 14 and Beach by Design) (Level Two Application) — FLD2008-05013A: CDB PUBLIC MEETING PRINT SET - PLANS — Community Development Board (2026-06-16)
Jun 16, 2026City of Clearwater, Pinellas County
The Wyndham Grand Resort is renovating its tiki bar and outdoor dining area. The project adds new landscaping, seating, and structures for food service. No building expansion or height increase is proposed...
- Agenda
Ranking of firms and agreements with four firms for the requirements of the St. Pete-Clearwater International Airport - Professional Engineering Services. — Final Agreement - AVCON — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County hired AVCON, Inc. to provide engineering services for the airport. Services will be billed at hourly rates ranging from $90 to $331 per hour.
- Agenda
Ranking of firms and agreement with WGI, Inc. for the Crystal Beach Drainage and Roadway Improvements - Professional Engineering Services project. — Final Agreement — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County hired WGI, Inc. to provide engineering services for the Crystal Beach Drainage and Roadway Improvements project. The total contract value is $1,193,200...
- Agenda
Third amendment to the agreement with US Submergent Technologies LLC for grit removal services, extending the term and increasing the not-to-exceed maximum expenditure amount. — OMB.REVIEW 26-0208D PCU US Submergent Technologies LLC 04-May-2026 — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County is extending a contract to remove grit from wastewater. The contractor, U. S...
- Agenda
Resilient Florida grant agreement with the Florida Department of Environmental Protection for the 98th to 100th Way Drainage Improvements project. — Agreement with Attachments 1-6 and Exhibits A, C, F, G,H, and J. — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
This is a grant agreement written by the state of Florida. The agreement describes payment procedures and requires Grantees to submit detailed reports. Florida can end the agreement if the Grantee fails to fix performance problems...
- Agenda
Resolution approving a Substantial Amendment to the 2025/2026 Annual Action Plan for the purpose of receiving a second allocation of Emergency Solutions Grant Rapid Unsheltered Survivor Housing funds. — 2025/2026 Annual Action Plan Substantial Amendment Clean Version — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County presented an update to its Housing Action Plan. The plan directs nearly $10 million toward housing development and services. Funds will help with affordable housing and homelessness...
- Agenda
Grant agreement with the United States Department of Transportation Federal Highway Administration for the Safe Streets and Roads for All grant for the Pinellas Advanced Technology for Traveler Information project. — Grant Application Narrative — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County is seeking a $10 million federal grant to improve road safety. The project uses advanced technology to detect crashes and reduce traffic deaths. The county has recorded nearly 600 traffic fatalities in the past five years...
- Agenda
Appointment and reappointments to the Emergency Medical Services Advisory Council (Board of County Commissioners as a whole). — Lindsey Kensinger Resume — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
This document is a personal resume for Lindsey Kensinger, not a government agenda. It details 16 years of fire and EMS experience at St. Petersburg Fire Rescue...
- Agenda
Division of Inspector General, Clerk of the Circuit Court and Comptroller, Report No. 2026-14, dated May 15, 2026 - Follow-up Investigation of Airport Personnel Travel and Conflict of Interest. — 2026-14, Follow-Up Investigation of Airport Personnel Travel and Conflict of Interest — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
The County Inspector General completed a follow-up investigation of how airport employees handled travel and conflicts of interest. Of three recommendations from the original report, two have been fully implemented. One recommendation about developing a travel policy is still being worked on...
- Agenda
Pinellas County Sheriff’s Office Fiscal Year 2027 Proposed Budget. — PCSO FY2027 Proposed Budget — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
The Pinellas County Sheriff's Office submitted its 2026-2027 budget. The total request is $417 million for law enforcement, detention facilities, and court operations. This budget will fund 2,513 full-time employees...
- Agenda
Case No. FLU-26-01 (Al Rahman, Inc.) A request for a Future Land Use Map amendment from Residential Rural to Institutional, for approximately 2.69 acres located at 2577 Keystone Road in East Lake Tarpon. — Traffic Analysis — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County analyzed traffic for a proposed land use change. A 2. 69-acre parcel would shift from residential to institutional use...
- Agenda
Resilient Florida grant agreement with the Florida Department of Environmental Protection for the Crystal Beach drainage and roadway improvements project. — Grant Agreement — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
This is a state grant agreement that sets out how the grantee must manage and spend grant money. The grantee must follow all state and federal rules for spending, record-keeping, and reporting to the state. If the grantee fails to meet requirements, the state can cut payments or end the agreement.
- Agenda
Ranking of firms and agreement with Fleischman and Garcia Architects and Planners, AIA, PA d/b/a Fleischman Garcia Maslowski for professional design services for the East Lake Community Library expansion. — Final Agreement — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County hired an engineering firm to design an East Lake Library expansion. The firm, based in Tampa, will prepare construction plans and specifications. The firm will also obtain all required federal, state, and local permits...
- Agenda
Award of bid to Air Mechanical & Services Corp. for STAR Center Air Handler Units 104, 161, and 162 replacements. — Agreement 26-0306-ITB-C AATF signed — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County approved a contract to replace three air handling units at the STAR Center. Construction will proceed while the building remains open and operating. Workers must comply with security requirements and citizenship rules for access to Raytheon areas.
- Agenda
Southwest Florida Water Management District Annual Comprehensive Financial Report for Fiscal Year Ended September 30, 2025. — SWFWMD-Fiscal Year 2025 Annual Comprehensive Financial Report — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
This report covers fiscal year 2025 for the Southwest Florida Water Management District. The district held $393. 6 million in unrestricted funds available for operations and future projects...
- Agenda
Community Redevelopment Agency, Pinellas County, Florida, Financial Statements, for the fiscal year ended September 30, 2025. (Due to scheduling challenges, the Clerk of the Circuit Court and Comptroller and Forvis Mazars will present the audit results at a July 2026 meeting.) — Community Redevelopment Agency Pinellas County Financial Statements 2025 - FINAL — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
The Pinellas County Community Redevelopment Agency audited its finances for the fiscal year ended September 30, 2025. The agency's assets exceeded its debts by $12. 8 million, up $2...
- Agenda
Division of Inspector General, Clerk of the Circuit Court and Comptroller, Report No. 2026-13, dated May 15, 2026 - Follow-up Audit of Utilities Meter Installation and Repair Process. — 2026-13, Follow-Up Audit of Utilities Meter Installation and Repair Process — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
The county's inspector general completed a follow-up audit of water meter operations. The audit reviewed whether the utilities department implemented 21 prior recommendations. Fourteen recommendations were fully addressed...
- Agenda
Citizens’ Guide to Pinellas County Finances (PAFR), for the fiscal year ended September 30, 2025. (Due to scheduling challenges, the Clerk of the Circuit Court and Forvis Mazars will present the audit results at a July 2026 meeting.) — Popular Report FY25 - FINAL(SECURED) — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County published its financial report for the year ending September 30, 2025. Hurricanes in 2025 damaged nearly 47,000 homes and 1,200 businesses in the county. The federal government awarded the county $813...
- Agenda
Division of Inspector General, Clerk of the Circuit Court and Comptroller, Report No. 2026-12, dated April 30, 2026 - Investigation of Public Works Overtime. — 2026-12, Investigation of Public Works Overtime — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
The county's Inspector General investigated an Operations Manager named Jones for excessive overtime and work misconduct. Over 14 months, Jones was paid for more than 1,000 overtime hours that lacked proper approval. The county discovered suspicious timecard entries and a GPS device that was deliberately disconnected from a vehicle...
- Agenda
Annual Comprehensive Financial Report (ACFR), Pinellas County, Florida, for the fiscal year ended September 30, 2025. (Due to scheduling challenges, the Clerk of the Circuit Court and Forvis Mazars will present the audit results at a July 2026 meeting.) — Annual Comprehensive Financial Report — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County completed its fiscal year 2025 with strong financial results. The county reduced property tax rates to the lowest level since 1990. Overall financial position increased by $450...
- Agenda
Agreement for Coordinated Access Model IT Platform Development Services with Ignyte Group, Inc. — 24-0552-RFP Agreement — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County hired Ignyte Group to build a new system. The system helps people apply for and receive behavioral health services. County residents will use it to find care providers...
- Agenda
Grant agreement with the United States Department of Transportation Federal Highway Administration for the Safe Streets and Roads for All grant for the Pinellas Advanced Technology for Traveler Information project. — Agreement including Articles 1-6 and Attachments A-G. — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County won a $4. 8 million federal safety grant. The new PATTI project will test crash detection and emergency response technology...
- Agenda
Case No. FLU-26-01 (Al Rahman, Inc.) A request for a Future Land Use Map amendment from Residential Rural to Institutional, for approximately 2.69 acres located at 2577 Keystone Road in East Lake Tarpon. — Application Documents — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
An application seeks zoning changes for a religious building in Tarpon Springs, Florida. The owner plans a new 5,244 square foot place of worship on 2. 68 acres...
Get notified about new filings
Set up a free alert and we'll email you the moment something matching your search is filed.