Search Florida filings
Every active municipality, every public filing type — meetings, permits, ordinances, hearings.
25 results for “independent district”
- Agenda
2025-11-11 Final Agenda Package Cedar Hammock
Jul 1, 2026Cedar Hammock CDD, Collier County
The District adopted stormwater management rules after a public hearing. The Board approved bridge repairs and erosion control projects. Capital spending includes bridge work, lake management, and drainage improvements.
- Agenda
FLD2026-01003: Flexible Development approval for light assembly and retail sales and services as a Comprehensive Infill Redevelopment Project in the Commercial (C) District for the properties located at 1425, 1429, 1433 and 1477 S. Ft. Harrison Avenue and the conversion to non-residential off-street parking in the Medium Density Residential (MDR) District for the properties located at 514 Belleview Boulevard. The existing buildings do not exceed 25 feet in height and include 43 off-street parking spaces. Requested is flexibility from front setback requirements, the use, and reduced interior landscaping and landscape buffers along the property lines through a Comprehensive Landscape Program. (Community Development Code Section 2-304.D, 2-704.F, and Sections 3-1202.D., E. and G.) (Level Two Application) — FLD2026-01003: APPLICATION — Community Development Board (2026-06-16)
Jun 16, 2026City of Clearwater, Pinellas County
A developer wants to convert some downtown buildings into shops and a workshop. The project includes demolishing an old house and building a new parking lot. The project needs city approval to place parking in a residential area...
- Agenda
Ranking of firms and agreements with four firms for the requirements of the St. Pete-Clearwater International Airport - Professional Engineering Services. — Final Agreement - AVCON — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County hired AVCON, Inc. to provide engineering services for the airport. Services will be billed at hourly rates ranging from $90 to $331 per hour.
- Agenda
Ranking of firms and agreement with WGI, Inc. for the Crystal Beach Drainage and Roadway Improvements - Professional Engineering Services project. — Final Agreement — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County hired WGI, Inc. to provide engineering services for the Crystal Beach Drainage and Roadway Improvements project. The total contract value is $1,193,200...
- Agenda
Resolution approving a Substantial Amendment to the 2025/2026 Annual Action Plan for the purpose of receiving a second allocation of Emergency Solutions Grant Rapid Unsheltered Survivor Housing funds. — 2025/2026 Annual Action Plan Substantial Amendment Clean Version — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County presented an update to its Housing Action Plan. The plan directs nearly $10 million toward housing development and services. Funds will help with affordable housing and homelessness...
- Agenda
Appointment and reappointments to the Emergency Medical Services Advisory Council (Board of County Commissioners as a whole). — EMS Advisory Council Roster — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
This document lists members of the Pinellas County EMS Advisory Council. The council includes representatives from various agencies and districts. It also includes fire chiefs and medical professionals...
- Agenda
Ranking of firms and agreement with Fleischman and Garcia Architects and Planners, AIA, PA d/b/a Fleischman Garcia Maslowski for professional design services for the East Lake Community Library expansion. — Final Agreement — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County hired an engineering firm to design an East Lake Library expansion. The firm, based in Tampa, will prepare construction plans and specifications. The firm will also obtain all required federal, state, and local permits...
- Agenda
Board of County Commissioners — Agenda (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
The Board of County Commissioners will consider multiple contracts and federal grant agreements. A $29 million flood mitigation grant from NRCS is the meeting's largest item. The Board will vote on professional services contracts and infrastructure projects...
- Agenda
Southwest Florida Water Management District Annual Comprehensive Financial Report for Fiscal Year Ended September 30, 2025. — SWFWMD-Fiscal Year 2025 Annual Comprehensive Financial Report — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
This report covers fiscal year 2025 for the Southwest Florida Water Management District. The district held $393. 6 million in unrestricted funds available for operations and future projects...
- Agenda
Community Redevelopment Agency, Pinellas County, Florida, Financial Statements, for the fiscal year ended September 30, 2025. (Due to scheduling challenges, the Clerk of the Circuit Court and Comptroller and Forvis Mazars will present the audit results at a July 2026 meeting.) — Community Redevelopment Agency Pinellas County Financial Statements 2025 - FINAL — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
The Pinellas County Community Redevelopment Agency audited its finances for the fiscal year ended September 30, 2025. The agency's assets exceeded its debts by $12. 8 million, up $2...
- Agenda
Independent Auditor’s Management Letter, Pinellas County, Florida. (Due to scheduling challenges, the Clerk of the Circuit and Comptroller and Forvis Mazars will present the audit results at a July 2026 meeting.) — Independent Auditor's Management Letter-Final 3.30.26 — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County completed its annual financial audit for the fiscal year ending September 30, 2025. An independent auditor issued the report on March 30, 2026. The County met all required standards with no financial problems found...
- Agenda
Debt Report, Pinellas County, Florida, for the fiscal year ended September 30, 2025. (Due to scheduling challenges, the Clerk of the Circuit Court and Forvis Mazars will present the audit results at a July 2026 meeting.) — Debt Report, Pinellas County, Florida, for the fiscal year ended September 30, 2025 — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County released its September 2025 debt report showing $57. 2 million in sewer system debt. The county carries no general obligation debt...
- Agenda
Annual Comprehensive Financial Report (ACFR), Pinellas County, Florida, for the fiscal year ended September 30, 2025. (Due to scheduling challenges, the Clerk of the Circuit Court and Forvis Mazars will present the audit results at a July 2026 meeting.) — Annual Comprehensive Financial Report — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County completed its fiscal year 2025 with strong financial results. The county reduced property tax rates to the lowest level since 1990. Overall financial position increased by $450...
- Agenda
Emergency Watershed Protection program grant agreement with the Natural Resources Conservation Service for restoration and stabilization for various channels throughout unincorporated County. — MIL-PIN-006 — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
The federal government will fund an emergency project for Joes Creek in Pinellas County. Hurricane Milton caused serious erosion damage along 6,494 feet of creek channel. The project protects homes and businesses from future flooding...
- Agenda
Emergency Watershed Protection program grant agreement with the Natural Resources Conservation Service for restoration and stabilization for various channels throughout unincorporated County. — MIL-PIN-004 — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County applied for federal funding to repair Joes Creek. Hurricane Milton damaged 3,799 feet of the creek. The project will remove sediment and stabilize eroded banks...
- Agenda
Emergency Watershed Protection program grant agreement with the Natural Resources Conservation Service for restoration and stabilization for various channels throughout unincorporated County. — MIL-PIN-007 — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Hurricane Milton damaged 2,568 feet of Joes Creek in Pinellas County. The county and NRCS plan to repair the eroded channel slopes. The project will cost $3...
- Agenda
Emergency Watershed Protection program grant agreement with the Natural Resources Conservation Service for restoration and stabilization for various channels throughout unincorporated County. — MIL-PIN-003 — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County received federal approval for a disaster recovery project. Hurricane Milton damaged Curlew Creek and Jerry Branch with erosion that threatened homes and businesses. The county will repair the creek channels for $5...
- Agenda
Emergency Watershed Protection program grant agreement with the Natural Resources Conservation Service for restoration and stabilization for various channels throughout unincorporated County. — MIL-PIN-005 — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County received approval to repair Joes Creek after Hurricane Milton damage. The project will remove silt, restore the channel, and plant vegetation. The 2,238-foot repair project costs $4...
- Agenda
Emergency Watershed Protection program grant agreement with the Natural Resources Conservation Service for restoration and stabilization for various channels throughout unincorporated County. — MIL-PIN-002 — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County received approval for emergency creek repairs after Hurricane Milton. Damaged channels will be restored to prevent future flooding and property loss. The project costs $2...
- Agenda
Resolution approving a Substantial Amendment to the 2025/2026 Annual Action Plan for the purpose of receiving a second allocation of Emergency Solutions Grant Rapid Unsheltered Survivor Housing funds. — 2025/2026 Annual Action Plan Substantial Amendment Strikethrough Version — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County will receive nearly $10 million in federal housing funding for 2025-2026. Home prices have doubled since 2014 while rents rose 68 percent, making housing unaffordable for most families.
- Agenda
Resolution approving the Fiscal Year 2026-2027 Annual Action Plan and authorizing actions related to the administration of the Community Development Block Grant, HOME Investment Partnerships, and Emergency Solutions Grant programs. — Fiscal Year 2026-2027 Annual Action Plan — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County will allocate $11 million to improve homes and neighborhoods in 2026-2027. The plan includes programs for homeless services, affordable housing, and homebuyer assistance. Median home prices of $355,100 are unaffordable for workers earning around $46,864 yearly.
- Agenda
Certifications and Assurances by the Chief Executive of the Applicant Government for the Edward Byrne Memorial Justice Assistance Grant Program Fiscal Year 2025 Local Solicitation. — BJA FY25 JAG Local (Grant Submission Package - Just Grants) 2025.04.22 — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County applied for a federal grant of $190,948. The grant funds crime prevention and law enforcement. St...
- Agenda
Award of bid to Daikin Applied Americas Inc. d/b/a Daikin Applied for boiler maintenance and repair. — Agreement — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County awarded a boiler maintenance and repair contract to Daikin Applied. The five-year contract costs up to $1. 36 million total...
- Agenda
Ranking of firms and agreements with four firms for the requirements of the St. Pete-Clearwater International Airport - Professional Engineering Services. — Final Agreement - Mohsen — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County hired Mohsen Design Group Incorporated for airport engineering services. The consultant will provide engineering support on an as-needed basis. The agreement requires standard insurance and employment compliance...
- Agenda
Ranking of firms and agreements with four firms for the requirements of the St. Pete-Clearwater International Airport - Professional Engineering Services. — Final Agreement - Kimley-Horn — Board of County Commissioners (2026-06-16)
Jun 16, 2026Pinellas County, Florida, Pinellas County
Pinellas County adopted a consultant services agreement template for professional services. The agreement sets hourly rates from $6 to $2,500 depending on the service type. Consultants must comply with federal employment laws, maintain public records, and follow insurance requirements...
Get notified about new filings
Set up a free alert and we'll email you the moment something matching your search is filed.